Before purchasing or leasing a factory, warehouse or other commercial property, you should examine the title deed record and any encumbrances, the property’s zoning status, the licenses and permits required for the intended activity, and the terms of the sale or lease contract. Carrying out this review before paying a deposit or signing a contract shows whether the property is actually suited to the planned business and under what conditions it may be used.
How Should the Title Deed Record and Ownership Status Be Checked?
First, the identity of the owner and any mortgages, attachments, or annotations (şerh) on the title deed record should be verified. For this review, an up-to-date title deed record and encumbrance report should be requested from the owner or their authorized representative. A mortgage remains attached to the property until it is formally released, regardless of a change in ownership. A buyer does not become personally liable for a debt secured by a mortgage merely by acquiring the property. If the transfer is intended to be free of the mortgage, the parties should agree in writing, before the transfer, on who will pay the secured creditor, how that amount will be deducted from the purchase price, and when the mortgage will be released.
For example, when purchasing a factory, the boundaries of the parcel, its road access, and whether any road decision in the zoning plan affects the parcel should also be checked against the cadastral map and zoning documents. For registered easements such as a right of way, the title deed record and related documents should be reviewed. In the case of shared ownership, a sale of one co-owner’s share to a third party may trigger the other co-owners’ statutory right of first refusal (pre-emption right).
Why Are the Property’s Zoning Status and Intended Use Decisive?
A parcel being designated as an industrial zone under the zoning plan does not, by itself, confirm that a planned storage or logistics operation is permitted there. The zoning plan and its accompanying notes, the building permit, the occupancy permit, and the licensing requirements for the planned activity must all be examined together. This is particularly important for a change of use, such as converting an existing factory into a warehouse, where whether the new activity may lawfully be carried out at that address should be confirmed with the competent authority.
For example, a building intended for lease as a warehouse may be registered in its approved project as an agricultural structure. Before signing the lease and incurring renovation costs, the tenant should review the building permit, the occupancy permit, and the approved project, and should ask the competent authority whether the planned storage activity can actually be licensed there.

What Permits Are Required for a Factory or Warehouse?
Before starting production or storage operations, a business opening and operating license must be obtained from the competent authority. The licensing requirements vary depending on the nature of the activity and the classification the business falls under. If the activity qualifies as a facility with environmental or public health risks (gayrisıhhi müessese), its specific risk class must also be determined. In organized industrial zones, the business opening and operating license is issued by the zone’s management body (OSB). Under an amendment dated 6 November 2026, these licenses in organized industrial zones must now be signed electronically through the online system.
For example, a facility processing chemical substances may require an environmental permit or environmental license in addition to the standard business license, depending on the nature of its activity. If an existing business is being taken over and the licensed activity, scope, and address remain unchanged, a new license can be issued in the name of the new operator based on the information and documents already on file, upon the new operator’s application. Whether a transfer, update, or new application is required for environmental permits and other sector-specific documents should be checked separately.
If production will take place, the industrial registry record, capacity report, and other documents specific to the line of business should also be reviewed. If an existing facility is being taken over, which documents will be updated and which will require a fresh application in the new operator’s name should be confirmed in writing with the relevant authority before the transfer.
Key Legal Points to Watch in the Sale Contract
A real estate sale contract can only be validly executed in the official form, at the land registry office or before a notary. Ownership passes only upon registration in the title deed registry. A private, informally signed sale protocol does not substitute for a valid real estate sale contract. A promise to sell real estate is likewise subject to the official form requirement.
For example, if an investor intends to make an advance payment for a factory building, the nature of that payment, whether it will be credited against the purchase price, and under what conditions it will be refunded if the sale does not proceed should all be settled in advance. If matters such as release of the mortgage, vacant delivery of the property, or confirmation of suitability for the planned activity are material to the purchase decision, the transaction documents should clearly state by when, and by whom, each of these is to be fulfilled.
What Should Be Checked in the Lease Agreement?
If the factory or warehouse building qualifies as roofed commercial premises, the provisions of the Turkish Code of Obligations on leases of roofed workplaces apply. If only an open storage yard is being leased, the general lease provisions may apply instead. Where an enclosed building and an open yard are leased together, which provisions govern should be assessed by looking at the leased property as a whole and the intended use stated in the contract.
For example, when a logistics company leases a warehouse, the contract should clearly set out the permitted use, the delivery date and delivery conditions, subleasing and assignment of the lease, return of the security deposit, and responsibility for maintenance and repairs. The contract may also specify whether the tenant can withdraw if the required license cannot be obtained, and how any payments already made will be refunded in that case.
For leases of roofed commercial premises, a rent adjustment for the new lease term may be requested in contracts with a term of more than five years, in contracts renewed after five years, and at the end of every subsequent five-year period. In setting the new rent, the court considers comparable rental values together with the twelve-month average change in the Consumer Price Index (CPI), the condition of the leased property, and overall equity.

What Is a Sensible Sequence to Follow Before Buying or Leasing?
First, the property’s title deed record, encumbrances, and zoning status should be examined. Next, the status of existing permits and the licenses required for the planned activity should be verified with the competent authority. Finally, the results of this review should be reflected in the sale or lease contract.
For example, if a warehouse is to be leased, whether the required license can actually be obtained should be investigated before signing. If the outcome of the licensing process is not yet known at the time of signing, the contract can expressly state who will file the application, when rent payments will begin, and what rights each party will have if the application is refused.
Legal Disclaimer








Comments are closed